Project 2016 - Introduction
Lesson – Working with Views
Project 2016
Procedures
1. Switch to the desired view. 2. Select the View tab. 3. In the Zoom group, from the Timescale drop-down list select Timescale . 4. Under Timescale options select the Show list. 5. Select the desired number of tiers. 6. Select the tab for the tier representing the largest unit of measure. 7. Select the Units list. 8. Select the desired unit. 9. Select the Label list. 10. Select the desired label. 11. Continue to make changes to the tiers of the timescales as desired.
12. Select
.
Step-by-Step
Format the timescale. Make sure that the Gantt Chart is selected.
Steps
Practice Data
1. Select the View tab.
The View ribbon appears.
Click
.
2. In the Zoom group, from the
Click the Timescale drop- down arrow and select .
Timescale drop-down list, select Timescale… . The Timescale dialog box opens with the Middle Tier page displayed. 3. Under Timescale options select the Show list. A list of tier options appears. 4. Select the desired number of tiers. The preview at the bottom of the dialog box reflects the change.
Click Show .
Click Three tiers, (Top, Middle, Bottom).