Project 2016 Intermediate
Lesson – Working with the Critical Path
Project 2016
Assigning overtime
Procedures
1. Switch to the Gantt Chart view.
2. Select the View ribbon.
3. Select the Detail s check box in the Split View group.
4. Select Task Form in the dropdown.
5. Select the task in the top pane associated with the resource to which you want to assign overtime. 6. Select the bottom pane.
7. Select the Task Form Tools Format tab.
8. In the Details group dslect the Work command.
9. Select the Ovt. Work field in the bottom pane for the desired resource.
10. Enter the number of overtime hours.
11. Assign overtime to any additional resources.
Page 64