Project 2013 Intermediate
Lesson 3 – Assigning Costs
Project 2013
Steps
Practice Data
5. Enter the desired value in the selected field. The desired value appears in the selected field. 6. Select the next rate field in which you want to enter a value. The desired field is selected. 7. Enter the desired value in the selected field. The desired value appears in the selected field.
Type 30.
Click the Overtime Rate field.
Type 45
8. Select OK .
Click
The Resource Information dialog box closes and the cost rate table is created.
A SSIGNING A R ESOURCE R ATE T ABLE
Discussion
You can create different rate tables for both work and material resources. You can then assign the rate tables to the desired tasks. For example, if a plumber receives $30.00 per hour for the initial plumbing and $25.00 per hour for the final plumbing, you can assign different rate tables to the two tasks or edit the base table and assign a different rate for the date the plumber is scheduled to do the final plumbing. Resource rate tables give you flexibility in assigning rates and tracking costs.
Page 64